This Guide to Practical Operational Amplifiers was written for a corporate R&D audience based on prior training I received, research I have performed into op[…]
The Young Wind Project is a renewable project I was a design engineer on. It is in the ERCOT region and totals approximately 560 MW[…]
The Lacy Creek Wind Project was a renewable project I was a design engineer on. It connected 108 GE turbines in the ERCOT region, and[…]
The Little Blue Wind Project was a renewable project I was a design engineer on. It connected 100 turbines in the SPP region, and totaled[…]
The White Mesa Wind Project was a renewable project I was a design engineer on. It connected 180 GE turbines in the ERCOT region, and[…]