Lacy Creek Wind Substation

The Lacy Creek Wind Project was a renewable project I was a design engineer on. It connected 108 GE turbines in the ERCOT region, and totaled approximately 300 MW of generation. My role in the project was related to the electrical and physical design of the 34.5 – 345 kV Generator Step-Up Substation.

Project Details

LocationTexas
Voltage Class34.5 – 345 kV
Facility Rating300 MW
Quantity of GSU Transformers2

Responsibilities

  • Design criteria document
  • Electrical & Physical QCs
  • Equipment specifications
  • Reviewing equipment vendor drawings
  • Lighting plan
  • Lightning protection design
  • AC/DC Panel Layout
  • Relay panel elevations & BOMs
  • Detailed electrical design
  • Battery sizing calculations
  • Ampacity calculations
  • Bus damping calculations
  • Conduit fill calculations
  • Voltage drop calculations
  • Communication diagram
  • One line drawings
  • Three line drawings
  • DC schematics
  • Wiring diagrams
  • Cable schedule
  • O&M standby generator physical plan and electrical design
  • As built drawings
  • Construction specifications
  • Construction walkdown
  • NERC-CIP data collection
  • NERC-CIP EAC & PSC drawings
  • Facility rating report

CATEGORIES:

Portfolio

Comments are closed