The 440 MVAR Series Capacitor Bank Station was a project to support adding additional generation to an existing transmission line. The intent of this project[…]
The 345 kV Line Addition project was a brownfield project I was a design engineer on. The intent of this project was to add a[…]
This is a renewable project I was a design engineer on. It is in the ERCOT region and totals approximately 225 MW of generation. My[…]
This solar project is a renewable project I was a design engineer on. It connects approximately 400 MW of generation. My role in the project[…]
This wind project is a renewable project I was a design engineer on. It is in the ERCOT region and totals approximately 560 MW of[…]
This wind project was a renewable project I was a design engineer on. It connected 108 GE turbines in the ERCOT region, and totaled approximately[…]
This wind project was a renewable project I was a design engineer on. It connected 100 turbines in the SPP region, and totaled approximately 250[…]
This wind project was a renewable project I was a design engineer on. It connected 180 GE turbines in the ERCOT region, and totaled approximately[…]