The White Mesa Wind Project was a renewable project I was a design engineer on. It connected 180 GE turbines in the ERCOT region, and totaled approximately 500 MW of generation. My role in the project was related to the electrical and physical design of the 34.5 – 345 kV Generator Step-Up Substation.
Project Details
Location | Texas |
Voltage Class | 34.5 – 345 kV |
Facility Rating | 500 MW |
Quantity of GSU Transformers | 3 |
Special Features | 34.5 kV Shunt Capacitor Banks |
Responsibilities
- Design criteria document
- Electrical & Physical QCs
- AC/DC Panel Layout
- Relay panel elevations & BOMs
- As built drawings
- Construction walkdown
- NERC-CIP data collection
- NERC-CIP EAC & PSC drawings
- Facility rating report