The High Banks Series Capacitor Bank Station was a project to support adding additional generation to an existing transmission line. The intent of this project[…]
The Irish Creek Line Addition project was a brownfield project I was a design engineer on. The intent of this project was to add a[…]
The Shamrock Wind Project is a renewable project I was a design engineer on. It is in the ERCOT region and totals approximately 225 MW[…]
The Waco Solar Project is a renewable project I was a design engineer on. It connects approximately 400 MW of generation. My role in the[…]