Irish Creek Substation Line Addition

The Irish Creek Line Addition project was a brownfield project I was a design engineer on. The intent of this project was to add a new 345 kV line position to an already existing wind collector substation. The scope of work included adding a motor operated disconnect and power circuit breaker. My role in this project was related to the electrical and physical design of the additions.

Project Details

LocationKansas
Voltage Class345 kV
Special FeaturesBrownfield

Responsibilities

  • Electrical & Physical QCs
  • Equipment specifications
  • Reviewing equipment vendor drawings
  • Lighting plan update
  • Lightning protection update
  • AC/DC panelboard update
  • Relay panel updates
  • Detailed electrical design
  • Battery sizing verification
  • Ampacity calculations
  • Bus damping calculations
  • Conduit fill calculations
  • Voltage drop calculations
  • Communication diagram updates
  • One line drawing updates
  • Three line drawing updates
  • DC schematic updates
  • Wiring diagram updates
  • Cable schedule updates
  • Construction walkdown
  • NERC-CIP data collection
  • NERC-CIP EAC & PSC drawings
  • Facility rating report updates

CATEGORIES:

Portfolio