The Irish Creek Line Addition project was a brownfield project I was a design engineer on. The intent of this project was to add a new 345 kV line position to an already existing wind collector substation. The scope of work included adding a motor operated disconnect and power circuit breaker. My role in this project was related to the electrical and physical design of the additions.
Project Details
Location | Kansas |
Voltage Class | 345 kV |
Special Features | Brownfield |
Responsibilities
- Electrical & Physical QCs
- Equipment specifications
- Reviewing equipment vendor drawings
- Lighting plan update
- Lightning protection update
- AC/DC panelboard update
- Relay panel updates
- Detailed electrical design
- Battery sizing verification
- Ampacity calculations
- Bus damping calculations
- Conduit fill calculations
- Voltage drop calculations
- Communication diagram updates
- One line drawing updates
- Three line drawing updates
- DC schematic updates
- Wiring diagram updates
- Cable schedule updates
- Construction walkdown
- NERC-CIP data collection
- NERC-CIP EAC & PSC drawings
- Facility rating report updates