October 2022 23
Young Wind Substation
Posted By : Isaac Mazel
Comments Off on Young Wind Substation

The Young Wind Project is a renewable project I am a design engineer on. It is in the ERCOT region and totals approximately 560 MW of generation. My role in the project is related to

October 2022 23
Lacy Creek Wind Substation
Posted By : Isaac Mazel
Comments Off on Lacy Creek Wind Substation

The Lacy Creek Wind Project was a renewable project I was a design engineer on. It connected 108 GE turbines in the ERCOT region, and totaled approximately 300 MW of generation. My role in the

October 2022 23
Little Blue Wind Substation
Posted By : Isaac Mazel
Comments Off on Little Blue Wind Substation

The Little Blue Wind Project was a renewable project I was a design engineer on. It connected 100 turbines in the SPP region, and totaled approximately 250 MW of generation. My role in the project

October 2022 23
White Mesa Wind Substation
Posted By : Isaac Mazel
Comments Off on White Mesa Wind Substation

The White Mesa Wind Project was a renewable project I was a design engineer on. It connected 180 GE turbines in the ERCOT region, and totaled approximately 500 MW of generation. My role in the