The Young Wind Project is a renewable project I am a design engineer on. It is in the ERCOT region and totals approximately 560 MW of generation. My role in the project is related to
The Lacy Creek Wind Project was a renewable project I was a design engineer on. It connected 108 GE turbines in the ERCOT region, and totaled approximately 300 MW of generation. My role in the
The Little Blue Wind Project was a renewable project I was a design engineer on. It connected 100 turbines in the SPP region, and totaled approximately 250 MW of generation. My role in the project
The White Mesa Wind Project was a renewable project I was a design engineer on. It connected 180 GE turbines in the ERCOT region, and totaled approximately 500 MW of generation. My role in the
The analytics GUI is a data processing, visualization, and management tool used to research new sensor applications and troubleshoot machine train issues due to new vibration modes. It is a project-centric GUI that allows the
This project explorers the ability to use Microelectromechanical Systems (MEMS) type accelerometers as a viable replacement for moving coil seismic transducers and/or piezoelectric accelerometers in the field of vibration monitoring for rotating machinery.
The Scout 100 and 140 can provide multiple Manual KPH (Keyphasor) Thresholds. These are nominally configured as: +3V, -3V, -8V, -13V, and -18V. It is possible that a valid small amplitude KPH signal within these
The purpose of this project is to interface an industry standard 4-20mA transducer to a remote server by sending simplex transmissions via the Globalstar satellite phone network. In order to fulfill the requirements set by